Process

Seven treads
from set to site.

The path is straightforward. What makes it work is getting the decisions made in the right order, on paper, before steel is cut.
  1. 01

    Drawings in

    Send the architectural and/or engineering set. Without drawings we can’t price a stair, so this is always the first tread.
  2. 02

    Review

    We read the set for scope, connections, finishes and anything left open. Questions come back in writing so the whole team sees them.
  3. 03

    Quote

    A price against the drawings and the assumptions we have listed. Our usual minimum is about one tonne of steel.
  4. 04

    Shop detailing

    Once engaged, shop drawings are prepared and issued for architect, engineer and builder review.
  5. 05

    Fabrication

    Cut, drilled, welded and checked in the shop. Indicative 4–6 weeks overall, confirmed against your program.
  6. 06

    Finish

    The specified system is applied: paint, galvanising or powdercoat, depending on what the drawings call for.
  7. 07

    Delivery & install

    Delivered to suit site access and installed to the approved shop drawings.

iTiming

4–6 weeks

Indicative, not a promise. Complexity, finish, approvals turnaround and current workload all move it. We confirm a timeframe once we have reviewed your drawings.

iiExisting clients

Client portal

Already working with Certified Steel? Use the shared client portal for your project.

Open portal

Next landing

Have drawings ready?

Request a project consultation and choose a preferred call time. We’ll confirm with you and arrange how to receive the drawings needed before quoting.