Process
Seven treads
from set to site.
The path is straightforward. What makes it work is getting the decisions made in the right order, on paper, before steel is cut.
- 01
Drawings in
Send the architectural and/or engineering set. Without drawings we can’t price a stair, so this is always the first tread. - 02
Review
We read the set for scope, connections, finishes and anything left open. Questions come back in writing so the whole team sees them. - 03
Quote
A price against the drawings and the assumptions we have listed. Our usual minimum is about one tonne of steel. - 04
Shop detailing
Once engaged, shop drawings are prepared and issued for architect, engineer and builder review. - 05
Fabrication
Cut, drilled, welded and checked in the shop. Indicative 4–6 weeks overall, confirmed against your program. - 06
Finish
The specified system is applied: paint, galvanising or powdercoat, depending on what the drawings call for. - 07
Delivery & install
Delivered to suit site access and installed to the approved shop drawings.
iTiming
4–6 weeks
Indicative, not a promise. Complexity, finish, approvals turnaround and current workload all move it. We confirm a timeframe once we have reviewed your drawings.
iiExisting clients
Client portal
Already working with Certified Steel? Use the shared client portal for your project.
Open portalNext landing
Have drawings ready?
Request a project consultation and choose a preferred call time. We’ll confirm with you and arrange how to receive the drawings needed before quoting.